29/03/2019

Backdrop painting started.

And about time too.

    I have procrastinated for way too long so last week I set about to start painting my backdrop for the Monarch Branch.
    I decided to start on the Poncha Junction side just to be different so started by roughing in the tops of where I wanted the mountains to go. Horizon lines on model railroads are in my view very critical if you want to create depth in a small space. Anyway the few images below show what I have started with. There is a very long way to go however a good deal of the backdrop will be plaster rock walls and a lot of trees.

Getting the trees deciduous underway.

And some distant hills with a hint of trees plus the foreground
Backdrop at the wye. Fairly happy thus far.

   That's it for this post.
Rod.

23/02/2019

A bit more done.

Rail and Tie painting

     As Helen and are still sorting out our garden in our new digs with more to do I found some time to relax and restart painting some of the track, turnouts and ties oh and finish off the fascia.
    Last Monday afternoon I made a start to cut and fit the remaining pieces of fascia around the duck-under at the entry to the garage from the house. That went much better and faster than expected so once completed I gave that area a coat of paint after first sanding down the surface filler covering any gaps and screw heads. I then set to and gave the rest of the fascia its second coat and made sure I covered the inside areas where the scenery will go so you will not see any bare MDF. Now that it is dry it has turned out better than I had expected as I had to sand the MDF after the first coat due to it getting a bit fluffy.

There is 4 steps down from the house into the garage (train Room)






     Now that was completed I felt in the mood to attack the remaining track and tie painting in Gunnison. I could only purchase non-weathered ME code 70 track at the time so that needed to be finished. I chose Tamiya Dark Iron for the track and for the hand made turnout rail and three shades of grey for the ties. Tamiya Light Grey, Medium Grey and MR Hobby Light Grey. I am surprised at how close a match the Dark Iron is to pre weathered ME track, it looks very good. So still motivated I finished all of the L/H/Side of the yard ties and all of the main line and siding ties. Still a few tracks to paint in Gunnison.



The start of the mainline into Cimarron
     Well that's it for this update thanks for stopping by.
Rod.


01/02/2019

Good progress this year.

Lots more done this past two weeks.

     Had the two lads, Big John and Little John come over to help complete the wiring of the last few MP1's and 5's in Poncha Junction. The control panel switches were then wired in, along with the track feeders to the turnout motors. Prior to the lads coming over I added all of the new turnout track feeder droppers and soldered some small track sections to ensue we had good track pickup.
    Whilst all this was going on Barry came over on his last day off on holidays to help me with all the fascia. I had the local hardware store cut 3mm MDF into strips 240mm wide to save us having to do all that. These sheets are 2420mm long and can be tricky to handle given its flexibility. One of the other issues was to mark out where my control panels were to be. Anyway things went very smoothly as we got almost all the fascia up and control panel holes cut.
    Next step was to patch all the holes (I wanted a very clean look to the fascia) which took not too long at all. Barry brought over his orbital sander which attaches to a vacuum cleaner to keep dust levels down. This worked very well and made the sanding job go real fast.
     I did more work to the fascia around the two duck-unders to finish these areas off leaving a small section to complete near the stairs into the house.
     Then came painting. I chose a different colour than the flat black I had used on my SFRSD as I wanted something different. I finally came across Dulux Klavier which is a black / purple colour depending from which angle you look at it.
    Here are a few shots of the progress to date.

Barry working hard at the town of Cimarron.

  


Track work completed at Poncha Junction





   Very happy to see so much progress so now I can start to arrange my operating timetable, car cards and way bills ready for an ops session.
   A big thank you to the two Johns and Barry for their invaluable assistance.
Thanks for stopping by on the Monarch Branch.
Rod.

13/01/2019

First post in the new year

Slow but steady progress.

     Well Christmas has been and gone and here we are already almost halfway into the first month of the new year.
     Been working in the garden trying to get that as close to finished as I can and working on a few videos with the main one being an update to Bills SN3 layout so he can have that for his trip to Seattle in April.
    Progress has been made on the layout with more turnouts made and installed in the town of Poncha Junction along with siding tracks. Both Johns have been a tremendous help by installing more of the MP5's under the layout. Ran out of feeder wire and just too bloody hot to work in the garage as we have had temps as high as 43C in Melbourne a few weeks ago, today is going to be 37C so just came in after completing the penultimate turnout. One to go yay!
    More work has been done on the D&RGW water tank. The stand is completed and I have weathered the tank timber ready for a light weathered spray of Depot Tan when the weather lets me.

 So here are just a few pics to show where I am up to.

Poncha Junction

Poncha Junction waiting for two more turnouts and motors of course.

View from the front door of the garage.




Water tank.



     Need to add the bands and band lugs then its ready for paint. And yes I did add the NBW's on the viewing side.

Well that's it for this post. Hope you all have a great 2019.
Rod.

26/12/2018

Ongoing progress slow but steady

Not that much done but.

     Progress has been a little bit slow the past two weeks what with Christmas and all however I have done a bit to the Monarch Branch to keep the juices flowing.
    The control panel for Poncha Junction has been designed by good friend J.F. printed and fitted to the panel. All of the switches have been installed and most wired but you guessed it I ran out of wire and the store is shut for Christmas.
    I decided to scratch build an ash pit for Gunnison and add another track to/or from the turntable which required an additional L/H turnout to be built and added to the main line. I am pleased to say that those jobs have been ticked off the list.

   
I made the pit by using 3mm MDF. It scales out at 1 foot wide.

    
Assembly completed with some Polystyrene girders added to support the rail.
    
Installed waiting for some ash and details.

     I have also started to assemble a Durango Press D&RGW water tank which I am doing in the study today as it is planned to be 37C outside. I had previously stained all the timbers using a Liquitex Acrylic light oak wood stain that has come up really well. I have also stained the timber tank ready for a weathered spray of Floquil Depot Yellow kindly offered by good friend Bill.



   Two 8ft x 4ft sheets of MDF cut to about 11 inches wide have been sourced ready to begin adding some fascias to the layout. I like this part of the journey as it makes the layout look so much better.
colour of them is yet to be decided however I am heading towards using a colour called Domino.  
   So that's about it until I can take a few more in progress images to post.
   I have also been working an a new version of a DVD for Bills Sn3 layout ready for his clinic in the USA next April so that keeps me off the street so to speak.
   Until my next post I trust you all have had a very Merry Christmas and have a safe & Prosperous New Year in 2019.
Rod.

04/12/2018

More work completed

Lots more done.

     Over the past few weeks lots more progress has been made on the Monarch Branch. More track laid quite a few more hand laid turnouts fitted including a #6 wye and painting cross-ties and track in Gunnerson well underway. New turnout motors fitted in Poncha Junction by Big and Little John over the past two weeks.
    Some images to show progress follow.



A visitor from the Los Pinos & Toltec RR

A meet at Cimarron with the visiting Goose and C19 #41



Could only build this using a Fast Tracks paper template together with the frog & point tool.



     Next stage is to work on making the last 7 turnouts needed, finalize the industries I want for Poncha Junction so the panel can be printed, add the roundhouse tracks from the turntable and work on the plans of where to put the water tank, ash pit and coaling tower ( if I have room) at Gunnerson.
    Thanks for taking the time to check on my progress in my blog.
Rod.

05/11/2018

First train on the D&RGW Monarch Branch

Just a quick video of the first train


     Lots done since the last post with thanks to good friends John F and John C.
This is RGS C19 #41 as she tests track and turnouts and the trestle on the line between Cimmeron and Gunnison.
Rod.