16/06/2015

Thompson River Canyon Pt 2

The Journey Continues
     Once we decided to build the TRC we wanted to push the envelope to show N Scale to its best especially since it was to primarily be an exhibition layout.
     The track plan was worked out over the kitchen table so we could have some industries at which to switch (to show the public how operations work) along with those fantastic snow / rock slides along the canyon which are a feature of the area.
     We also decided that the RR would use Digitrax DCC, use Micro Trains code 55 track along with some hand made turnouts and an important feature in our minds was to incorporate a signalling system. We wanted the layout (track) to be much higher off the ground (56 inches ) so you looked into the trains and a deep fascia to help frame the scene and allow room to hold our Digtrax Up5's and turnout control panels. It also provided room under the track to hold all of our trains, signalling system and the Digitrax command station and power packs.
     Vic is a master at producing custom made, brass etched signals as seen on my RR.
     The track plan is simple. Single track with a passing siding on both sides (to allow bi-directional running) with a couple of industry tracks and a house track on the front module. We added four storage tracks behind the front backdrop to allow us to make up trains which also allowed us to change the trains more often to keep the public interested.

      The number of modules was also important so we could fit them into our existing vehicles. I chose to build the rear half of the layout so that comprised the two corners and the three four foot modules. Vic had a ute so he took to build the front sections which comprised two six foot straight modules and the two larger corners. In fact all of the layout was built in my workshop given that I had all the machinery necessary to build what was needed. The layout is 16ft long and 8 ft wide so plenty big enough. The front modules are 18 inches deep with the rear only 12 inches.
    We purchased several sheets of 7ply and had it ripped to 3 inch wide strips with which to make all of the frames. We wanted to use this as we thought it would be more stable than plain pine.
    It took quite a few months to get to the stage you saw on the first post but there was still a long way to go.
   The signalling system was one of the biggest hurdles. We had seen a system when in San Diego at an N Scale convention and the following NMRA train show called Signalling Solutions. This system was quite new however it looked like it might just do the trick for the TRC. Vic and John made contact with the owner, sent him our track plan and following many emails later agreement was made as to what was needed to run the layout as prototypical as we could. Noel, one of our longstanding friends having an excellent knowledge of wiring and an N Scale modeler to boot was gently persuaded to do the wiring of the signalling system. I'm not sure Noel nor any of us realized just how difficult this was  going to be. So after many wiring diagrams later, (some 3 feet long) we were able to get the wiring in, mount the main boards and all of the signal drivers. Then lots of tweeking to get it to work.

Little John did all of this wiring

We utilized Automotive wiring connectors to plug the many module wiring looms together. We cut off the retaining clips so they became more easily removable. Here you can see the module legs sitting in their sockets. We also added small legs so the fascia did not hit the ground when we were setting up. This allowed us to get our fingers under the modules.

It was a bloody hot day the first time we were able to get all modules onto our deck to start testing the wiring. Here good friend Little John is contemplating what might have gone wrong. We were sure we had it right the first time. You can see the shelf holding the Digitrax command station. All of the wiring for these sections were made into small looms so we could quickly fit them. Each piece of electrical equipment had timber locating fixtures so they went in only one place during assembly.
This was a Walthers station Kit that I altered slightly to make it look a bit more Canadian

Taken as we were checking to see how we could fit them into the new trailer that Vic purchased to carry the whole layout.
    One of our other goals was to get the layout up and running for the 2003 Melbourne N scale Convention. Boy this sure put the pressure on however we got there even though we had not made any light fixtures.

It fits! Just no legs and lights.
Just one of Vic's superb Signal gantry's
   We survived the convention and then set about building our light boxes. These followed the contour of the modules and were made the same size to fit over each module. We chose to use 25 watt small frosted globes spaced 18 inches apart, these worked very well. To connect the light boxes we used old computer power cable male and female sockets along the top of the light fittings.
   The first time we were able to use the lights was at the 2006 AMRA Model Railway Exhibition at Box Hill. We were also able to use our black drapes so the layout looked quite good once the layout was set up, drapes on and the lights all plugged in.

I took this shot before the crowd arrived for the second day of the AMRA exhibition in 2006 and we were very proud to receive our first.award.
    Vic and I could not have completed the layout without the great help of Little John and Noel nor be able to set up, run and strip down at each show without Brendan, Ron, Greg, Big John and few of our other mates. Thanks guys.

A ten loco lash-up created by Brendan one lunch break

   There are a few You Tube videos of the TRC taken by others so if you want to see some action head over there.
   The TRC was a very enjoyable layout to share with a good many mates.

Thanks for stopping by.
Rod.

06/06/2015

Thompson River Canyon

Looking back
    Last July I added some images of Thompson River Canyon a layout built by Vic and myself many years ago that now resides at Barry's house.
    I thought I would show some construction images I took way back so the quality may not be that good however it might show some of the techniques we used and what it looked like on display.
    So here goes.

This how we stacked the foam to start our mountains on one of the corner modules.
Here is all the frame work. We deliberately made the fascia 12 inches deep so we could recess all the panels.

More mountain material going in along with the start of the fascia

This is one of the three 4 foot modules with mountains now showing some  progress.
 To get the mountains to some shape we just hacked the foam with a small chisel and a Stanley knife following images we copied from a video of the area.

Another corner with  scenery underway.

All of the tunnels were lined and the portals scratch built following the prototype as closely as possible
As the modules needed to be transported we did not want to add plaster rocks it would be way too heavy. So we thought why not try tile grout. This was the start to see how it would look. Much to our surprise it turned out better than we had hoped.

Now dry before we added any stone dust.
A test run with my new PWRS special run CN hoppers by Deluxe.
Recessed panels made it safer for transporting

We protected the backdrop while adding the grout with cling wrap. Sure saved a lot of cursing.
Vic standing and John under the module adding droppers on one of the two front 6 foot modules.
CP GP30 holding at one Vics scratch built brass signals.

Two Dash 9's that I custom painted and decaled.
Two of the scratch built snow / rock slide sheds. The one above was made using styrene the one on the right was 3mm MDF covered with styrene sheet and scribed to represent marks left by concrete forms.
     Seeing these images again has brought back some great memories. Next post I will try to find my  images of the layout on display showing the light boxes and signage.
That's it for today.
Rod.

29/05/2015

Another Friday night ops session

The 97th SFRSD Bulletin
 
    Boy time fly's fast, here it is almost the end of another month. I hold almost all of my ops sessions on the last Friday of the month and have done so for many years and last night was no exception.
My invitation to the normal crew is really not necessary as most now know it is a given so it is really a formality and a confirmation that it is on and so I can check to see how many of the lads can attend.
   
     I am up to SFRSD bulletin number 97. Not all of them have been about ops sessions some have been about updates to the RR and special events but never the less most have been operating sessions.
   
    The bulletin below is a standard that I have used for many years and was used to rally the troops for last nights session.
    
     Almost all the crew were available bar two, one traveling interstate and the other to purchase a new car, so this gave me the opportunity to invite a guest for his first visit to an operating session.

     Jason is building quite a good sized HO RR based on the Reading Lines and is currently installing detection and signalling with the help of a few of my operators (we all share our experiences) and was looking to see how my car card and operating system worked.
   
     The night kicked off with the usual show and tell and once completed it was time to start the fast clock. I asked Greg if he would be dispatcher again as I felt I needed to run a train or two.

     Once the Aug / Fly and the Fly / Aug trains departed it was time to get ready to send out the two sweepers.
     One leaves Augusta and the other Flynn once the first two trains arrive at their destinations.

     Dennis and I teamed up to run the Aug / Hac / Aug sweeper. This train takes out empty grain cars that have just arrived at Augusta and runs as far as Hackney dropping off empties and picking up loaded grain cars from Udall, Hackney and Winfield in that order.


Here the Win / Guthrie cement train sits in the siding at Hackney to allow our sweeper to arrive.
     The Win / Guthrie cement train leaves the Winfield Cement siding at the East of Winfield at 9.30am. It has no priority so can sit for several hours if the dispatcher is not on the ball. It travels from Winfield to Hackney then onto Guthrie and returns picking up any stray 2 bay hoppers and ballast cars from Perry on its return to Winfield. This job can take hours but can be a lot of fun.


Here our sweeper is sitting at Winfield waiting for a green to head back to Augusta after switching Hackney and at Winfield.

Noel and Jason teamed up to run the Fly / Pon sweeper. Here you can just make out the track inspection car behind the SP SD45 passing the sweeper at Ponca City. This ran as an extra last night as the dispatcher found some gaps in the timetable.
    Ponca is a very busy spot and can be tricky to switch as many trains can run by and the industry sidings are quite short. On some occasions the yard crew may send out too many cars to spot which causes headaches for the crews.


GP30 3255 heads the cement train back across the dry creek between Hackney and Winfield


A couple of GE's sitting on the departure track at Flynn with the Fly / Aug manifest freight waiting for its time to depart. 
The Au / Hac sweeper arriving back at Augusta




A couple of GM units on the point of an Extra to Ponca as it heads to Hackney after just leaving Winfield. It is scheduled to return to Augusta.
    This extra was needed as there was a build up of cars in the Augusta yard that the yard master had requested be moved. Dennis and I ran this train that took hours on the fast clock to switch as there were too many cars for each of the sidings at Ponca. We ran past our time and went dead in the siding at Hackney as we headed back to Augusta.
  
     So after starting the fast clock at about 7.45pm real time we stopped the session at 11.00pm after getting almost through the whole timetable.
  
     It was good to have the guys over, share some trains with Dennis and let Jason see how an operating session works on the SFRSD.
  
     A great night thanks guys.
Catch you next time.
Rod.

19/04/2015

On our way to Brendan's D&H

Saturday morning
    9.45am and we were underway heading to Sunbury about an hour and a quarters drive from my home to visit the D&H RR which was having its last run before being torn down ready for a house move for Brendan and his family.
   I had arranged with John the owner of the AT&SF Boise City sub to drop in on our way and so arrived at about 10.00am. (there where rumors that this RR is going as well so there are a lot of concerned operators in our group at the moment).
  As we did not have too long to stay here are just a few pics.
 

Gordon videoing at Amarillo on the Boise city Sub


Marsh station
more happy AT&SF modelers
     Then it was time to depart and head to Sunbury about 45 klm away to meet up with the rest of the crew at Macca's as we were all heading to Brendans planning to arrive just after lunch.
    A few quick pics of the RR then down to some operating.
This is a big layout and it will be sad to see it go after such a short time in existence

.





Breaking news

    As we were taking a break in the arvo, the news broke that Chris a good mate and Brendan had hatched a plan so Chris could purchase the D&H and move it to his new train room. It will become a BN RR and the good news is that it will only be 2 kilometers away. Now we will have two in the same area how cool.
    To make the announcement Brendan and Chris had set up two pass trains without any of us picking it up and here they are.



and a couple of very happy guys.


Brendan on the left with a smiling Chris on the right.
Great news lads.

     Gordon and I left about 4.00pm headed home and then out to dinner with Gordon and my wife Helen. We got back here at about 7.00pm and then Gordon was able to download over 700 plus images of layouts and UP steam stuff off his laptop so I can share it with the guys.
     Unfortunately I was not able to be around Sunday so John C was to be Gordon's chauffeur for the day and that was planned to be another long day.

Thats it for this post.
Rod.



  

Visitor from the USA

Following the N Scale Convention.
    I was unable to attend the 14th National N Scale convention held in Brisbane the weekend following Easter which was a little disappointing as it is the first I have missed since they commenced in Sydney in 1989. I knew that a few modellers from North America where coming over to attend one being Gordon Bliss from Houston. Gordon and I have been emailing one another for a few months following pictures of our two layouts being placed in N Scale Railroading in the same month publication.
    So I suggested that Gordon should see if he could get some extra time to come visit us in Melbourne during his time in Australia and get to see some more N Scale Layouts.
    Well that didn't take too much persuading so after attending the convention meeting Mal and a few other modelers in Canberra Gordon arrived in Melbourne on Friday afternoon.
    I switched with one of our regular Friday round robin guys so they could all come to the SFRSD during our normal get togethers. Morning tea, lunch, watch videos (train stuff of course) and then run trains on the RR pretty much in that order.
   Gordon arrived at about 4.15pm and met the guys. A quick dinner of pizza and then Ron and Greg arrived to start a small ops session to get Gordon into the mood.
  Here is just a few shots of the night on the SFRSD with a few of the guys and a foreign dignitary running some trains.



Here's Gordon in charge of the Fly / Aug Grain
Greg acted as dispatcher for a while

Peters first night session (Peter is one of our Friday group)
John working Flynn
Bill enjoying the night
Ron concentrating as he cleans wheels on a loco for me.
Gordon switching at Augusta with John
A couple of happy Santa Fe Modelers.
    That was day one.
    On Saturday morning I picked Gordon up from his motel as we were headed to Brendan's D&H RR for its last run and so stopped in to see the Boise City sub of Johns on the way. More to come on the next post.
Thanks for stopping by.
Rod.



02/04/2015

More Weathering for Graham

Grahams latest Mexican Locos
   As you have probably gathered I enjoy weathering. Most of my Loco's and rolling stock are done so I enjoy being able to help out my mates if they'll let me.
   Graham is a busy guy at the best of times and so he lets me grunge up his Locos for his RR. I've shown a few in the past so today here are the latest three to be sent to Mexico.
   In the not too distant future I hope to be able to show some of these babies on the RR.

The first is an SD60 in KCS colours

I didn't want to overdo this loco so I just added a very small amount of panel line black paint to all of the door latches, along the roof line and the grills before giving the whole loco a spray of fade. A mist of mud on the side to follow the prototype image and that was about it.

An Alco C628

I did a bit more work to this after this picture was taken. It looked too clean on the side sill compared to the prototype I was following so I just blackened it up a bit along the top edge with some black oil paint dabbed on with a tooth pick and cotton bud.

and last but not least a B23-7

This loco only received a spray to fade it down with a small amount of panel line detail added.  I did add a small amount of rust wash around the springs of the trucks.
     One thing I have found is that Tamiya Nato Black is a very good substitute for weathered black. I used it on the trucks and fuel tanks on all three locos and it looks very good. When I was fading the locos I allowed the spray to just kiss the trucks after painting with the Nato Black and it made them stand out nicely. A touch of black wash around the journals and the job was done.
    Now I have another three to paint KCS grey and give those a touch of weathering.
Until the next post thanks for stopping by.
Rod.